Skip to main content

Box 167

 Container

Contains 23 Results:

Hill District: An Analysis of Part of the Lower Hill District Adjacent to and Eastwardly of the Downtown Business District, Prepared by the Pittsburgh City Planning Commission, 1950

 File — Box: 167, Folder: 1
Scope and Contents From the Sub-Series:

Subseries 3 contains reports, studies and proposals for redevelopment projects in Pittsburgh from roughly 1950 to 2000. The subseries is arranged alphabetically by neighborhood. A few of the redevelopment projects include photographic surveys, namely for projects in South Side, Hazelwood, Manchester and the Hill District.

Dates: Other: 1950

Hill District: Redevelopment Area Plan for Redevelopment Area #3, Lower Hill District, Prepared by the Pittsburgh City Planning Commission (copy 1), 1955

 File — Box: 167, Folder: 2
Scope and Contents From the Sub-Series:

Subseries 3 contains reports, studies and proposals for redevelopment projects in Pittsburgh from roughly 1950 to 2000. The subseries is arranged alphabetically by neighborhood. A few of the redevelopment projects include photographic surveys, namely for projects in South Side, Hazelwood, Manchester and the Hill District.

Dates: Other: 1955

Hill District: Redevelopment Area Plan for Redevelopment Area #3, Lower Hill District, Prepared by the Pittsburgh City Planning Commission (copy 2), 1955

 File — Box: 167, Folder: 3
Scope and Contents From the Sub-Series:

Subseries 3 contains reports, studies and proposals for redevelopment projects in Pittsburgh from roughly 1950 to 2000. The subseries is arranged alphabetically by neighborhood. A few of the redevelopment projects include photographic surveys, namely for projects in South Side, Hazelwood, Manchester and the Hill District.

Dates: Other: 1955

Hill District: Redevelopment Area Plan for Redevelopment Area #3, Lower Hill District, Prepared by the Pittsburgh City Planning Commission (copy 3), 1955

 File — Box: 167, Folder: 4
Scope and Contents From the Sub-Series:

Subseries 3 contains reports, studies and proposals for redevelopment projects in Pittsburgh from roughly 1950 to 2000. The subseries is arranged alphabetically by neighborhood. A few of the redevelopment projects include photographic surveys, namely for projects in South Side, Hazelwood, Manchester and the Hill District.

Dates: Other: 1955

Hill District: Modification No. 1 of Redevelopment Area Plan, Redevelopment Area No. 3, Lower Hill District, Pittsburgh City Planning Commission, Urban Redevelopment Authority of Pittsburgh, 1957

 File — Box: 167, Folder: 5
Scope and Contents From the Sub-Series:

Subseries 3 contains reports, studies and proposals for redevelopment projects in Pittsburgh from roughly 1950 to 2000. The subseries is arranged alphabetically by neighborhood. A few of the redevelopment projects include photographic surveys, namely for projects in South Side, Hazelwood, Manchester and the Hill District.

Dates: Other: 1957

Hill District: Lower Hill, Pittsburgh, A Webb and Knapp Project, I.M. Pei and Associates, Architects and Planners, Planning Section, c. 1959

 File — Box: 167, Folder: 6
Scope and Contents From the Sub-Series:

Subseries 3 contains reports, studies and proposals for redevelopment projects in Pittsburgh from roughly 1950 to 2000. The subseries is arranged alphabetically by neighborhood. A few of the redevelopment projects include photographic surveys, namely for projects in South Side, Hazelwood, Manchester and the Hill District.

Dates: Other: c. 1959

Hill District: Gateway Redevelopment Corporation, A Proposal for the Redevelopment of Parcel G in the Lower Hill Project Area, c. 1959

 File — Box: 167, Folder: 7
Scope and Contents From the Sub-Series:

Subseries 3 contains reports, studies and proposals for redevelopment projects in Pittsburgh from roughly 1950 to 2000. The subseries is arranged alphabetically by neighborhood. A few of the redevelopment projects include photographic surveys, namely for projects in South Side, Hazelwood, Manchester and the Hill District.

Dates: Other: c. 1959

Hill District: Lower Hill Redevelopment Project, Land Disposition Documents, Urban Redevelopment Authority of Pittsburgh, 1959

 File — Box: 167, Folder: 8
Scope and Contents From the Sub-Series:

Subseries 3 contains reports, studies and proposals for redevelopment projects in Pittsburgh from roughly 1950 to 2000. The subseries is arranged alphabetically by neighborhood. A few of the redevelopment projects include photographic surveys, namely for projects in South Side, Hazelwood, Manchester and the Hill District.

Dates: Other: 1959

Hill District: Lower Hill Project, Land Disposition Contract between the Urban Redevelopment Authority of Pittsburgh and Webb and Knapp, Inc., 1960

 File — Box: 167, Folder: 9
Scope and Contents From the Sub-Series:

Subseries 3 contains reports, studies and proposals for redevelopment projects in Pittsburgh from roughly 1950 to 2000. The subseries is arranged alphabetically by neighborhood. A few of the redevelopment projects include photographic surveys, namely for projects in South Side, Hazelwood, Manchester and the Hill District.

Dates: Other: 1960

Hill District: Lower Hill Project, Land Disposition Contract between the Urban Redevelopment Authority of Pittsburgh and Golden Triangle Motor Hotel, Inc., 1961

 File — Box: 167, Folder: 10
Scope and Contents From the Sub-Series:

Subseries 3 contains reports, studies and proposals for redevelopment projects in Pittsburgh from roughly 1950 to 2000. The subseries is arranged alphabetically by neighborhood. A few of the redevelopment projects include photographic surveys, namely for projects in South Side, Hazelwood, Manchester and the Hill District.

Dates: Other: 1961