Skip to main content

Box 159

 Container

Contains 31 Results:

Greenway: Feasibility Study, Greenway Project, Prepared by General Analytics, Inc. for the Urban Redevelopment Authority of Pittsburgh, 1969

 File — Box: 159, Folder: 30
Scope and Contents From the Sub-Series:

Subseries 3 contains reports, studies and proposals for redevelopment projects in Pittsburgh from roughly 1950 to 2000. The subseries is arranged alphabetically by neighborhood. A few of the redevelopment projects include photographic surveys, namely for projects in South Side, Hazelwood, Manchester and the Hill District.

Dates: Other: 1969