Skip to main content

Port Authority of Allegheny County, Preliminary Engineering Drawings, Airport Busway/Wabash HOV--Phase I, Prepared by Michael Baker Jr., Inc., 1993

 Item — Box: 230, Item: 4

Scope and Contents

From the Sub-Series:

Subseries 6 contains reports about transportation infrastructure, including many project reports and studies on highways.

Dates

  • Creation: 1993

Extent

From the Collection: 273 Cubic Feet : 218 archival boxes and 26 oversize boxes.

Language of Materials

From the Collection: English

Repository Details

Part of the City of Pittsburgh Archives Repository

Contact:
414 Grant St.
Pittsburgh PA 15219 United States