Skip to main content

Pittsburgh Technology Center: Pittsburgh Technology Center, Final Land Development Plan, Subdistrict 1-East, Draft #3, 1989

 File — Box: 181, Folder: 9

Scope and Contents

From the Sub-Series:

Subseries 3 contains reports, studies and proposals for redevelopment projects in Pittsburgh from roughly 1950 to 2000. The subseries is arranged alphabetically by neighborhood. A few of the redevelopment projects include photographic surveys, namely for projects in South Side, Hazelwood, Manchester and the Hill District.

Dates

  • Other: 1989

Extent

From the Collection: 273 Cubic Feet : 218 archival boxes and 26 oversize boxes.

Language of Materials

From the Collection: English

Repository Details

Part of the City of Pittsburgh Archives Repository

Contact:
414 Grant St.
Pittsburgh PA 15219 United States