Downtown Pittsburgh North Shore/CBD Transportation Corridor, Major Investment Study, Report 6 of 8, Summary of Conceptual Light Rail Transit Alignments, Prepared by Parsons Brinckerhoff for the Department of City Planning, City of Pittsburgh and the Southwestern Pennsylvania Commission, 1999
File — Box: 140, Folder: 7
Scope and Contents
From the Sub-Series:
Subseries 8 contains reports about mass transportation systems in Pittsburgh and other U.S. Cities. Particular reports of interest include those that reference mass transit systems that never came to fruition, including an underground subway system proposed by the Department of City Planning in the 1930s. In the mid-1960s, the Westinghouse Company’s Skybus project was proposed, which was a major mass transit proposal that would have provided continuous service via the Skybus rail.
Dates
- Other: 1999
Extent
From the Collection: 273 Cubic Feet : 218 archival boxes and 26 oversize boxes.
Language of Materials
From the Collection: English
Repository Details
Part of the City of Pittsburgh Archives Repository
Contact:
414 Grant St.
Pittsburgh PA 15219 United States
414 Grant St.
Pittsburgh PA 15219 United States